| 
|
| |
Survey Trips |
|
|
| |
|
For additional information about cave surveying, visit the Survey and Cartography Section of the National Speleological Society website.
|
| |
|
Our survey data is processed using Compass Cave Survey Software.
|
| |
Return to the Projects Page |
|
Chucky's Cave Survey Project
Chucky's Cave is located in south Texas on private land. It is a vertical cave with an entrance drop of 35 feet.
| Data Summary as of March 6, 2006 |
Number Of Surveys = 8
Number Of Stations = 70
Included Shots = 70
Excluded Shots = 0
Ignored Shots = 0
Number Of Loops = 1
Absolute Stations = 0
|
Included Length = 1,336.7 Feet (0.25 Miles)
Excluded Length = 0.0 Feet
Total Surveyed = 1,336.7 Feet (0.25 Miles)
Horizontal Length = 11246.3 Feet (0.24 Miles)
Horizontal Excluded = 0.0 Feet
Cave Depth = 83.1 Feet
Surface Length = 260.6 Feet
Surface Width = 219.7 Feet
Surface Area = 57,263.4 Ft^2
Enclosed Volume = 4,759,823.5 Ft^3
Cave Volume = 107,205.6 Ft^3
Average Diameter = 9.0 Feet
Volume Density = 2.25 %
Average Inclination = 13.2 Deg.
Difficulty = 17.0
|
Highest Station = ED0 (0.0 Feet)
Lowest Station = B13 (-83.1 Feet)
North Station = D15 (130.6 Feet)
South Station = B7 (-89.1 Feet)
East Station = A14 (145.4 Feet)
West Station = C9 (-115.2 Feet)
Average Shot Length = 19.1 Feet
Longest Shot = 47.4 Feet
Shortest Shot = 6.4 Feet
|
View Line Plot
Profile
Plan
|
View Map
Map
|
|
| SURVEY TRIP 5 | June 18, 2005 |
| Survey #7 |
| Instruments: | Whitney Reynolds |
| Lead Tape: | Greg McCarty |
| Sketch: | Brian Alger |
| Stations: | C16 - C25 |
| Tie Ins: | C7 |
| Total Surveyed: 282.3ft |
| Total Time: 2hrs |
|
| Survey #6 |
| Instruments: | Whitney Reynolds |
| Lead Tape: | Greg McCarty |
| Sketch: | Brian Alger |
| Stations: | D14 - D15 |
| Tie Ins: | D10 |
| Total Surveyed: 48.4ft |
| Total Time: 1hrs |
|
| Top |
| SURVEY TRIP 4 | August 18, 2004 |
| Survey #5 |
| Instruments: | Lee Ann Dean, Dan Dennison |
| Lead Tape: | Susan Alger |
| Sketch: | Brian Alger |
| Stations: | C1 - C15 |
| Tie Ins: | ED1 |
| Total Surveyed: 266.0ft |
| Total Time: 4hrs |
|
| Survey #4 |
| Instruments: | Tim Kohtz |
| Lead Tape: | Lee Ann Dean |
| Sketch: | Tim Kohtz |
| Stations: | D1 - D13 |
| Tie Ins: | ED1,C15 |
| Total Surveyed: 161.9ft |
| Total Time: 4hrs |
|
| Top |
| SURVEY TRIP 3 | November 15, 2003 |
| Survey #3 |
| Instruments: | Lee Ann Dean, Dan Dennison |
| Lead Tape: | Susan Alger |
| Sketch: | Brian Alger |
| Stations: | B1 - B13 |
| Tie Ins: | ED1 |
| Total Surveyed: 217.8ft |
| Total Time: 4hrs |
|
| Top |
| SURVEY TRIP 2 | June 28, 2003 |
| Survey #2 |
| Instruments: | Whitney Reynolds, William Tucker |
| Lead Tape: | Susan Alger, Lee Ann Dean |
| Sketch: | Brian Alger |
| Stations: | A5 - A14 |
| Tie Ins: | A5 |
| Total Surveyed: 146.5ft |
| Total Time: 4hrs |
|
| Top |
| SURVEY TRIP 1 | October 26, 2002 |
| Survey #1 |
| Instruments: | Dan Dennison |
| Lead Tape: | Susan Alger |
| Sketch: | Brian Alger |
| Stations: | ED0 - ED1, A1 - A5 |
| Entrance: | ED0 |
| Total Surveyed: 213.8ft |
| Total Time: 6hrs |
|
| Top |
|
|
NSS Home Page

NSS Convention

Report Littering

Lubbock Weather
|
|